• The specified file temporary://fileDEbPfo could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileiFo4Ge could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Construction of four lane bridge across River Bhagirathi at 195 + 160 of NH-34 near Berhampur (W.B.)