Error message
  • The specified file temporary://file7y9Hdd could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileVKVzWk could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

भागीरथी नदी के पार नवाद्वीप,जिला-कृष्णनगर (पश्चिम बंगाल) में राज्यराजमार्ग-8के1.70किलोमीटर परबडेरेलवे सेतु का निर्माण।