Error message
  • The specified file temporary://filePbuDgV could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filezcXQpt could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

बिहार राज्य में राष्ट्रीय राजमार्ग-31के खगरिया- बख्तियारपुरप्रखंड के चार लेन के लिए गंगा नदी (राष्ट्रीय जलमार्ग-1)पर सड़क सेतु का निर्माण।