Error message
  • The specified file temporary://filedBha2j could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filecSEXMq could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

गंगा नदी के पार आरा और छपरा के बीच राष्‍ट्रीयराजमार्ग-30और राष्ट्रीयराजमार्ग-19 (बिहार) को जोड़ने वाले सड़क सेतु का निर्माण